No quote request, no callback, no estimate that changes later — and nothing to pay until a supplier has taken your job.
Pick the job, then set strength, cubic metres, finish and distance. The price updates as you move.
Your pour goes to every supplier covering your postcode: the mix, the volume, the day and the window. Not your name, not your address, not your phone number.
First to accept pours it. Nobody is bidding — the price is already set, so the only question is who says yes.
One email names the supplier and confirms the date and window they accepted. Your site details reach them at that moment, and not before.
Payment is the last step, not the first. Nothing is charged when you book: the pour is confirmed once the payment is in. Trade accounts settle monthly instead.
We are not a batching plant. We work with a number of them, and the one that pours your job is decided after you book, not before.
Concrete is priced by the cubic metre but delivered by the truck. Past one full load the rest comes behind it as a smaller measure load — and that is the part you can still change on the day.
This is the whole list. Nothing is added at checkout, and nothing waits for the invoice to show up.
Auckland-wide, plus the northern runs out of Warkworth and beyond, where an out-of-area charge applies and is shown before you commit. Your postcode picks the nearest depot and the distance is priced from there.
Build your pour and watch the number move. It takes about a minute.
Start your pour →